DRAFTING DRILL - CEDAR CREEK BOAT RAMP
July 21, 2009
ON JULY 21ST CHIEF ENGINEER CHRIS WAS TEACHING A CLASS ON DRAFTING AND USING MARINE 89 AS A WATER SUPPLY UNIT. ALL THAT PARTICIPATED CERTAINLY LEARNED ALOT. BOTH HOW TO DRAFT USING ENGINE 89-1 AND HAVING THE BOAT ABLE TO SUPPLY ENGINES USING A 5" HOSE OR (2) 3" HOSE LINES HOOKED TO A GATED WYE.